
It's been a few weeks since I've seen the new Gregg's
Bellevue Cycle location and when I saw it again I has amazed. I suppose I shouldn't have been, we're planning to open the doors to the public sometime in April so it should be close to finished right? And it is! Here are a few pictures of the building inside and out.

This picture shows the view from what is the first floor. At this point (and things are always flexible at this point!) this will be the bike sales floor. This picture is taken from the east (
Bellevue Way) side of the building looking north.

I know, not a very exciting picture, but the elevator will become a very necessary part of a two story bike shop. The service department is located on the second floor of the building and this full size freight elevator will make it a breeze to get your bike up to get it's
tune up.

Here, our owner, Stan Gregg and our office manager, Nancy are busy checking out the bathroom in what will become the employee lounge and break room.

Here we are looking down the stairs into what will become our "Grand Foyer". We're planning on making this a very inviting area with displays, cycling information a place to sit and relax while others might be shopping or maybe watch a cycling event on one of the large
TV's planned to be in the store. Maybe there will even be a little espresso down here? Like I said, it's all a little flexible at this point!

This is the upper floor which will house our parts and accessories along with our service area. The area you're looking at here may also have kids bikes , trailers or joggers. It's a huge space and we're looking forward to filling it!

The whole store features great views of downtown
Bellevue.

Here's a look at the main stairway on the first floor which will be the home to a huge selection of bikes.

Another look at the second floor , the parts and accessories area. Also, behind that window will be our conference room. Great for meetings and clinics.

They are just starting to put the finishing touches on the outside of the building. Our new signage should be up any day now.

This is a view of the back of the store where we also have great windows and a second story employee deck for lunches during the sunny months.
We're really excited about the new
Bellevue location. A lot of people have put a lot of work and thought into the planning and building of what will become one of the premier bike shops in the country.
Labels: Bellevue, construction
0 Comments:
Post a Comment
Links to this post:
Create a Link
<< Home